Home›Wynn Al Marjan in the UAE: project and opening outlook

Wynn Al Marjan in the UAE: project and opening outlook

Is Wynn Al Marjan receiving guests yet?

Current public access

Wynn Al Marjan Island is taking shape on Al Marjan Island as the Ras Al Khaimah casino project. The resort was not open on 10 August 2026. Wynn's most recent timetable points to welcoming its first guests in September 2027.

Key project figures and status

The summary below pairs each status with its reference date, helping separate finished work from future plans. These details can move as the project advances, so the date and source matter as much as the figure itself.

TopicLatest known positionSource date
Public accessBuilding work continues; visits have not begun10 August 2026
Planned openingSeptember 2027Wynn results, 4 August 2026
Gaming permitGCGRA lists Island 3 AMI FZ-LLC, trading as Wynn Al MarjanLatest GCGRA register
Tower design70 floors; planned top height is 352 metres above sea levelResort website
Guest unitsStructural work completed across all 1,530 units2 February 2026
Gaming space225,000 sq ft, approximately 20,900 sqmWynn 2025 annual filing, March 2026

While building continues, the hotel, restaurants and gaming floor are unavailable to visitors and cannot yet be reserved. Wynn's mailing list is for updates; joining it neither secures accommodation nor provides access.

A closer look at Wynn Al Marjan Island

A destination with several kinds of attractions

This will be Wynn's first integrated resort in the Middle East and North Africa, and the developers describe it as the UAE's first as well. Plans combine a hotel, licensed gaming, dining, live entertainment, retail, spa facilities, a beach, marina and spaces for events.

The island location and project partners

The development covers more than 60 hectares facing the Arabian Gulf on Al Marjan Island in Ras Al Khaimah. Wynn Resorts, Marjan and RAK Hospitality Holding are represented in the joint venture. According to the GCGRA register, Island 3 AMI FZ-LLC holds the gaming licence.

Meaning of an integrated resort

An integrated resort is a wider hospitality destination, not simply a casino attached to a hotel. Public plans describe rooms, restaurants, recreation, events and entertainment; the specific games planned for the casino have not yet been detailed by Wynn.

Wynn now points to a September 2027 opening

The company's latest timetable

In its second-quarter results published 4 August 2026, Wynn identified September 2027 as the planned guest opening. This gives a month, unlike earlier mentions of 2027 generally, its first quarter or spring.

Changes to the projected date

Investor documents had previously indicated the first quarter of 2027. Wynn noted a small delay in May 2026 and promised an update; the August release subsequently moved its guidance to September 2027.

Keep plans flexible

Company reporting is the best current reference, but construction and interior completion mean a target month is not a guarantee. Check the official resort site and recent Wynn investor updates before committing to travel costs that cannot be refunded.

Key dates in the development

Events marking progress

Read the announcements in date order to see how the Ras Al Khaimah proposal became a licensed project under construction, with a current month given for opening. Earlier scheduling statements should not be confused with today's guidance.

WhenAnnouncement or eventWhy it matters
25 January 2022Al Marjan Island partnership unveiledInitial plans and schedule were introduced
4 October 2024Wynn reported receiving a commercial gaming facility operator licenceFirst such licensed commercial gaming venue in the UAE
25 November 2025On-site event celebrated topping out the 70-floor hotel towerA prominent point in the tower's construction
December 2025Later Wynn reporting marked structural concrete completionAttention moved to the upper structure, exterior and interiors
2 February 2026Facade at 83%; 1,530 units structurally complete; Wynn Bridge at 48%Latest release with detailed construction percentages
11 March 2026Work restarted following a brief pauseConstruction update only, with no opening or cancellation announcement
29 June 2026New theatre work announced with PunchdrunkA headline production was added to the planned launch offer
15 July 2026Investor slides depicted substantial interior activityVisual evidence that fit-out was proceeding
4 August 2026Wynn specified September 2027 for the openingCurrent company guidance for trip planning

Why November and December both appear

Wynn's project story places the ceremony for the 70-floor tower on 25 November 2025; subsequent company reporting records structural concrete completion in December 2025. The two dates refer to separate milestones, so they are shown independently here.

Building progress reported by August 2026

High-rise structure and exterior

According to Wynn on 2 February 2026, concrete structure had reached the roof of level 71, and crews had installed 21,852 of 26,471 facade panels, or 83%. Its guest website calls the building a 70-floor tower; both descriptions are retained without inferring a revised floor total. Interim height figures have varied in Wynn releases, while the published final target remains 352 metres above sea level with the spire.

Interior fit-out and lower structures

Lifts and escalators were being installed, alongside mechanical, electrical and finishing work throughout guest accommodation. Concrete and structural steel work for the low-rise buildings had reached 99%; this measure alone does not indicate that those areas can receive visitors.

Road connection under construction

The planned 548-metre Wynn Bridge will link the resort via Wynn Boulevard with roads E311 and E611. On 2 February 2026 it was 48% complete: piling had finished and nine of the ten column pile caps were installed. Wynn's then-current aim was to finish it in late 2026.

What the August update confirms

The August results described fast construction progress, while the second-quarter presentation, dated 15 July 2026, showed substantial work inside the resort. Neither publication replaced the facade or bridge percentages, so the available measurements remain those reported in February.

Gaming area and overall resort dimensions

Wynn's reported area

The 2025 annual filing Wynn submitted in March 2026 gives the gaming space as 225,000 sq ft, or roughly 20,900 sqm. This is the latest figure stated directly in a company filing.

The older 18,500 sqm estimate

Past property descriptions and media reports, some still appearing in search, often put the casino at about 18,500 sqm. Wynn has not explained whether that and the newer figure describe different areas. The older number is therefore noted as an estimate, not combined with the current filing.

MeasureFigure usedHow to read it
Gaming area225,000 sq ft, about 20,900 sqmLatest figure in Wynn's annual filing
Older figure still repeated onlineAbout 18,500 sqmLegacy estimate, not the current lead figure
Development siteMore than 60 hectaresThis whole integrated resort, not only the gaming floor
Hotel tower70 floorsCurrent guest-facing description
Structure in the February update299 metres through the level 71 roofA dated construction measurement, not final height
Planned height with spire352 metres above sea levelFinal architectural target on the resort website

Details that area figures cannot answer

The size of the floor says nothing about slot machines, table count, game selection or how much space will be private. Wynn had released none of these specifics by 10 August 2026; check for a later statement from the operator before relying on an inventory.

Guest rooms and residential options

Inside the 1,530-unit inventory

Wynn reported in February that structural work on all 1,530 lodging units was complete, although finishing the interiors remained underway. Apartments, townhomes and estates are already included in the categories below and should not be added again.

CategoryNumberPublished description
Resort rooms1,217Rooms and suites in the main Resort Tower
Enclave suites297A hotel within a hotel on the upper floors
Royal Apartments2Two apartments at the top of the tower
Garden Townhomes4Standalone garden accommodation in the resort plan
Marina Estates10Residences beside the marina
Total1,530Current announced guest inventory

The Enclave concept

Enclave occupies upper floors as a hotel within the larger hotel, with dedicated lifts, an entrance and arrival space. Its offer centres on suites and separate service. Wynn has not announced rates, packages or when reservations will begin.

How the 1,542 figure differs

Some older Wynn announcements gave 1,542 rooms, a total competitors continue to repeat. Current resort material and the February 2026 construction release list categories that add up to 1,530, which is the count used in this guide.

Dining, performances, shops and artworks

A planned line-up of 22 dining venues

The resort site lists 22 restaurants, bars and lounges, alongside a beach club operating during the day. Wynn has identified an Alain Ducasse French-American steakhouse and a second Delilah supper club. At the time of this update, diners could not make restaurant reservations.

A Punchdrunk production at The Showroom

Wynn's 29 June 2026 announcement introduced a new Punchdrunk production scheduled to launch with the resort. The concept offers a conventional upstairs seated show or an immersive route through lower and backstage areas. Performance dates and ticket prices are still unknown.

Shopping plans and resort artworks

A shopping parterre filled with natural light is planned for luxury retailers, though no complete tenant list is available. Art will appear in shared areas and rooms. Announced pieces include Jeff Koons' 11-metre Tulips, as well as historic and modern works by artists from the region and abroad.

Coastline, swimming, spa and boating

Along the waterfront

The proposal features 420 metres of private white-sand shoreline and a deep-water marina intended for large yachts. A beach club for daytime use is also on the plan. Wynn has not explained day-pass availability or access for people who are not staying at the resort.

Swimming and wellness facilities

Published amenities include 12 pools, cabanas, gardens, a five-star spa, salon and fitness centre. The company has yet to share pool access conditions, opening times or treatment costs, leaving those items out of any dependable visit budget for now.

Facilities for families

A kids' club appears among the official facilities, alongside outdoor activities, indicating that family use is part of the non-gaming offer. No age range, charge or supervision policy has been announced. Families will need the eventual guest rules before arranging childcare.

Meetings and celebrations at Coral Court

The 7,708 sqm event venue

Coral Court serves as the resort's centre for events and celebrations, spanning 7,708 sqm. The plan includes six flexible meeting rooms, individual salons for brides and grooms, plus private prayer rooms for women and men.

A ballroom with an open span

Overlooking the marina, the 2,633 sqm Grand Ballroom is designed without internal columns. Organisers can use its area to compare venues, but guest capacity depends on the chosen layout, staging, aisles and technical equipment.

Details to get before confirming an event

As of 10 August 2026, Wynn had not released prices, packages or minimum spend requirements. When event sales begin, ask for a written capacity layout and pricing that covers catering, production, accessibility and cancellation, rather than deriving attendance from square metres.

Finding the resort on Al Marjan Island

Airport journeys, including from Dubai

Al Marjan Island is in Ras Al Khaimah, and the resort is not in Dubai. Wynn estimates roughly 15 minutes by car from Ras Al Khaimah International Airport. A financing announcement in 2025 put the drive from Dubai International Airport at about 50 minutes.

Starting point or routeOfficial informationPlanning decision
Ras Al Khaimah International AirportAbout 15 minutes by car on the resort websiteReview the journey time on arrival day because traffic changes
Dubai International AirportAbout 50 minutes in Wynn's 2025 release, with the resort less than 50 miles awayAdd baggage and traffic time instead of treating the estimate as a guarantee
Wynn BridgePlanned link through Wynn Boulevard to E311 and E611Late 2026 was the completion target, so verify that the route is open
Resort shuttleNo operating timetable or fare publishedDo not plan around a service the operator has not announced
Parking and valetFinal operating details not publishedCheck arrival instructions when reservations open

The bridge's planned road connection

The intended 548-metre connection should give the resort a more direct road link, although Wynn's latest detailed report still treated the bridge as a work site. Confirm completion with Wynn or a current map before relying on this route.

Things to confirm on travel day

Once reservations are possible, check the exact drop-off location. The hotel, marina and event centre could have distinct entrances. Leave extra time, and only pay for a transfer that is confirmed in writing with the booking.

  • Confirm the terminal, airport and flight details before arranging a car.
  • Look up current conditions on E311, E611 and Wynn Bridge.
  • Ask which entrance and luggage drop point apply to your stay.
  • Check parking, valet and accessible arrival arrangements as you reserve.

Gaming oversight and the GCGRA licence

The entity holding the licence

Under land-based gaming facilities, the GCGRA register of licensees names Island 3 AMI FZ-LLC, which trades as Wynn Al Marjan. Wynn said on 4 October 2024 that this project company received the UAE's first commercial gaming facility operator licence.

What the listing tells visitors

The register associates this particular land-based venue with a GCGRA licence. The UAE Lottery appears in a separate category, operated by The Game LLC. Once open, Wynn Al Marjan is expected to be the Gulf Cooperation Council's first licensed casino. More on the regulatory framework appears in our UAE gambling laws overview.

Rules to look for before visiting

Wynn still needs to explain gaming-floor requirements covering age, identification, entry, responsible gaming and complaints. Until it publishes those conditions, policies at other Wynn resorts should not be assumed to apply here.

Details still awaiting a Wynn announcement

Information checked on 10 August 2026

A property's operating arrangements can evolve as opening approaches. This list sets out what remained unknown alongside confirmed information, to help distinguish a sign-up, concept image or outside offer from a firm commitment by the resort.

DetailStatus on 10 August 2026What to do
Hotel bookings and room ratesReservation date and prices not announcedJoin official updates and wait for Wynn's booking engine
Restaurant reservationsNot open on Wynn's dining pageDo not pay an unverified intermediary for a table
Casino game listTable, machine and title counts not publishedWait for the operator's gaming information
Betting limitsMinimum and maximum stakes not publishedDo not substitute limits from Wynn Las Vegas
Age, ID and admission chargesFinal Wynn conditions not publishedCheck Wynn and GCGRA before travelling
Dress code and opening hoursNot publishedReview the guest guide when it appears
Shuttle, parking and valetNo operating timetable or pricing publishedRequest confirmation with the hotel booking
Theatre ticketsInterest registration available, schedule and prices incompleteDo not treat registration as a ticket

Signing up only requests news

Visitors can leave an email address and select topics to receive announcements from Wynn. This does not hold a room, meal or show seat, nor establish a rate or priority; only a separate confirmed reservation can do that.

Three checks for current information

Consult Wynn's resort pages, confirm the licensee in the GCGRA register, then compare the opening information with the latest investor release. Where these official sources are silent, treat the answer as unpublished rather than borrowing another property's rules.

  1. Check when the web page or release was published.
  2. Tell a planned milestone apart from a completed one.
  3. Save reservation and cancellation records when bookings become available.

A responsible approach to a future visit

Check eligibility and set a limit

This page's gaming material is intended for adults aged 18 and above. Under GCGRA advertising standards, a person below 21 is underage for commercial gaming other than lottery. Wynn had not issued final ID or admission conditions for the gaming floor by this update. Confirm them before travelling, as a hotel stay may not grant access to every venue.

An example budget using UAE dirhams

For illustration only, imagine allocating 800 United Arab Emirates dirhams (AED) to a day out in the future. Set aside AED 500 for travel, meals and a buffer, then cap gaming at AED 300, whatever happens during play. These are example amounts, not Wynn prices.

Decide in advance when to stop

Before entering, choose a spending ceiling and a departure time. Keep other payment cards and money out of the plan. If you reach either limit, finish for the day rather than using your reserve or trying to win back losses.

  • Keep rent, bill payments and borrowed funds out of play.
  • Avoid increasing a wager to win back a previous loss.
  • Schedule breaks and set an alarm for your finish time.
  • Once your cap is reached, leave your bank card unused.
  • If Wynn provides them, consider a cooling-off period or self-exclusion when you need distance.

Recognising when support may help

Take a break if play brings secret spending, debt, anxiety or problems at work or home. Our responsible gambling guide covers signs to notice, ways to stop and where to find support.

Answers to common Wynn Al Marjan questions

Before arranging your trip

These responses reflect official sources checked on 10 August 2026. When reservations become available, check the schedule and entry conditions again because resort details may be updated.

Short answers to key questions

No. Work on the resort is ongoing. Wynn's 4 August 2026 update expects the first guests in September 2027, when the property is due to open.